Assignment successfully completed
Thermal Power Projects




Distribution of spare parts of Combustion Engineering USA's boiler operating in India in Power Stations of DVC, Tata Power, DPCL, Hindalco, MSEB etc.

Distribution of Spare parts of ABB, Berlin's turbines in Power Stations of Hindalco.

Co-ordinated supply, erection & commissioning of 2 x 74 MW Steam Turbines of ABB Germany (now Alstom Power) for Renusagar Power Station of Hindalco. Also successfully negotiated issue of contract closure and Final Acceptance Certificate over prolonged negotiations lasting 4 years.

Arranged Collaboration between GE, USA and BHEL for modernisation of Turbine Manufacturing.

Played stellar role in rejuvenation of ABL as a GOI company, secured important initial orders Neyvelli units 1 and 9, Sanjay Gandhi Birsingpur (2 x 210 MW), and ESP's for Bhusaval, Parli, Nasik Power Station of MSEB, after ironing out long standing dues.

Introduction of concept of "Comprehensive Refurbishment" of Thermal Power Stations in the country. Panipat (4 x 110 MW) secured for ABB Germany (now Alstom Power) for comprehensive Refurbishment from Haryana State Electricity Board (now Haryana Power Generation Corporation Ltd.), alongwith KFW assistance from Germany.

Identification of Refurbishment potential out needs of Obra (5 x 50 MW + 3 x 100 + 5 MW x 200 MW), Amarkantak ( 2 x 120 MW) Talcher (4 x 62.5 MW), Faridabad (3 x 60 MW) with ABB Berlin (now Alstom Power)/Skoda/BHEL etc as leading member and FMPL as BOP partner.



Hydro Power Projects

  Residual Life Assessment testing and studies at the 2 x 30 MW Giri Power Station of HPSEB, have been completed on the 22nd July 2005; and the Detailed report in under finalization. We have since submitted our final report to HPSEB on 20th December, 2006.




Water Projects

  In association with Scott Wilson Piesold, UK, Reassessment of ground
water availability in the A K Basin, north of Chennai city, has been
completed after conducting field work and studies for over 2 years, in
March 2004. Total resource management planning to ensure that the
abstractions for irrigation & domestic purposes are limited to the
sustainable yield of the basin as defined by the studies has also been
completed in July 2005. Final report submitted in October 2006.




Projects under Implementation




Sharan Hydro Electric Power Project
Developing 2 x 1300 KW hydro electric power project on the Left Bank of Chakki Nallah (a tributary of Beas river) near Sharan village in Kullu District of Himachal Pradesh. Annual Generation of 13.77 Million Units. Energy generated will be purchased by HPSEB at Rs. 2.50 per unit for 15 years. The PPA has since been signed in July 2005. The estimated cost of completion is Rs. 15 crores. The Project is to be completed in 2009, with subsidized funding through IREDA.
Efforts are now being concentrated on acquiring virgin Hydro Power
Potential sites near Sharan in H.P., near Chickmangloor in Karnataka,
and near Kalyan in Maharashtra.

Contract closing for a major hydro-electric power project, recently commissioned. Work is in progress and is expected to be completed by December 2007.
Hydro Electric Power Plant Spares
FMPL are authorised representatives of M/s Alstom Power - Germany and
V A Tech Hydro Italy/Swizerland for supply of spare parts. FMPL has arranged specialised spares for Hydro Plant of S. J. V. N. L (Jharkhri) HP such as, Runners, Guide Vanes, Generators, MIV spares etc.
   




Upcoming Projects
Hydro-Electric Power Projects




Arranged Collaboration between GE, USA and BHEL for modernisation of Turbine Manufacturing.

RLA studies of 2 Generator at Dehar Hydro Power Project (6 x 160 MW) Bhakra Beas Management Board have invited tenders for testing 2 generators of their Dehar Power house from the firms registered with PFC, in which FMPL has participated. The tenders are under finalisation.

Rampur HE Project Satluj Jal Vidyut Nigam have invited offers for Review Consultants for finalisation of Detailed Project Report from "Short listed consultants" Fourseasons Vatech Hydro Italy / Swizer land are jointly submitting their proposal for the assignment.

Lease Based Hybrid Financing of Hydro Power Projects - Scott Wilson Piesold & Fourseasons are jointly pursuing this new concept of financing and turnkey execution of Hydro power projects, World Bank has already approved it. A number of presentation were made to the Ministry of Power/NHPC officers, and others concerned with hydropower development in the country. Acceptance of Hybrid Concept is catches UP and B.B.M.B. and SJVNL are studying in detail - to enable them to adopt the concept.

Efforts are on for developing a medium size hydropower project on pilot basis.




Thermal Power Projects




Preliminary studies relating to Comprehensive Refurbishment of Faridabad TPS (3 x 60 MW)

Co-ordination of supply of steam turbines upto 50 MW capacity manufactured by UK and German associates in Indian Power and Industry sectors.




Infrastructural Projects





Identification of Consortium members for financing & turnkey execution of Road and Sea Link projects in Maharashtra.